New 230kV Capacitor Bank Installation at Existing Substation

Owner: Lafayette Utilities System
Location: Lafayette, Louisiana
Project Cost: $1,120,000
Start: November 2012
End: July 2013

General Scope of Project: This project involved construction of a new 230 kV bay with two owner provided gas breakers for two Capacitor Bank units and all associated structural steel, bus and High Voltage components on an existing substation. EPB was responsible for procurement of High Voltage electrical equipment and instruments, civil, site, structural, grounding and static protection components. EPB was responsible for demolition and removal of existing structure, foundations and bus.

Summary of Services Rendered: EPB provided complete demolition, civil and site construction, fencing, steel erection, bus installation, grounding, underground raceways and trench system, cable installations, switches and installation of all substation Capacitor Bank structures and components, including the two (2) owner provided gas breakers.


 


 

© Copyright 2018, E. P. Breaux Electrical, LLC. All rights reserved.