Faraday Switching Station Gail, Texas

New 345kV Switching Station

Owner: WETT Wind Energy Texas Transmission
Project Cost: $5,512,000.00
Start: September 2012
End: June 2013

General Scope of Project: This project involved Procurement and Construction of a new 345kV Switching Station. The scope of construction was to install Control House, Breakers, Switches, CCVTs, Cable Trench, Conduit, Control & Power Cable, Bus Work, Steel Structure Installation, 10 high Carbon Steel mesh Substation Fence, Limestone Rock Surfacing, Grounding and Electrical Testing & Commissioning Services.EPB also constructed 135 Foundations totaling in excess of 700 cubic yards of concrete, installed misc electrical apparatus, Yard Floodlights, Fiber Optics, and a 100kW Standby Generator along with a 500 Gallon Propane Fuel Tank.




 