Cottonwood Switching Station – Dickens County, Texas

New 345kV Switching Station

Owner: WETT – Wind Energy Texas Transmission
Project Cost: $5,290,000.00
Start: January 2012
End: December 2012

General Scope of Project: This project involved Procurement and Construction of a new 345kV Switching Station. The scope of construction was to install one (1) Control House, fifteen (15) 345kV Breakers, thirty four (34) 345kV Switches, twenty two (22) 345kV CCVT’s, 1,700’ of Cable Trench, Conduit, 308,000’ of Control & Power Cable, Bus Work, Steel Structure Installation, 10’ high Carbon Steel mesh Substation Fence, Limestone Rock Surfacing, Grounding and Electrical Testing & Commissioning Services.EPB also constructed 327 Foundations totaling in excess of 1,300 cubic yards of concrete, installed misc electrical apparatus, ninety (90) Yard Floodlights, Fiber Optics, and a 100kW Standby Generator along with a 500 Gallon Propane Fuel Tank.


 


 