Owner: City of Carencro
Project Cost: $500,000
Start: April 2009
Finish: November 2010

General Scope of Project: The scope of this project was included providing and installing a new 1000A, 3 Phase Main Disconnect Switch with Main Distribution Panel, and a 550 KW Generator with 1000A ATS switch. Also provide were soft start units for each of the 4 water well motors. We provided installation and assistance with start up for the plant controls and instrumentation which were provided by others. EPB provide all raceway and conductors as required for power, lighting, and controls for Fire Alarm Sprinkler and Access Control Panels, well motors, filter valve equipment, and chemical equipment.

Summary of Services Rendered: EPB provided Electrical Procurement and Construction Services for the project as a Sub-contractor to a Prime contractor.


 

 